AMC Tender β€” Set 3 of 5
Queue position 1
Processing
AMC Tender β€” Set 4 of 5
Queue position 2
Queued

New comparison

Original Spec PDF
Drop PDF here
Addendum PDF
Drop PDF here
Processing

Comparing spec against addendum…

This usually takes under a minute for a demo run.

← List
AMC Tender Spec vs Addendum No.1 ✓ Evidence complete
Spec Tender_Spec_Rev3.pdf · Add Addendum_No1.pdf · 12 add · 6 rem · 9 chg · 2 tbl
Export
ADD 27.1 Exact span Add p.3 · exact · New intumescent fire-stop requirement for riser penetrations

Summary of changes

Page 14 of 42
90%+🔍
Original Spec
PARTICULAR SPECIFICATION
PS.BS02

27. Fire-Rated Cabling and Containment

27.1 The Contractor shall provide fire-rated cabling throughout all riser shafts, rated to 90 minutes in accordance with the base building specification.

27.2 All cable containment above false ceilings shall be galvanised steel trunking, minimum 100x50mm.

31. Testing and Commissioning

31.4 Testing and commissioning of the fire alarm system shall be witnessed by the Employer's Representative no less than 5 working days prior to handover.

Page 3 of 6
90%+🔍
Addendum No.1
TENDER ADDENDUM No.1
PS.BS02-1

27. Fire-Rated Cabling and Containment

27.1 The Contractor shall provide fire-rated cabling throughout all riser shafts, rated to 120 minutes in accordance with the base building specification.

27.1A New: All penetrations through fire-rated risers shall be sealed with an intumescent fire-stop system, tested to BS 476 Part 20.

31. Testing and Commissioning

31.4 Testing and commissioning of the fire alarm system shall be witnessed by the Employer's Representative no less than 10 working days prior to handover.