Crewio
Command & Control · for FSE Engineering

Welcome Back

Sign in with your email and OTP

Crewio /Comparisons
Command & Control

Review queue

Comparisons

Filter by status or file type, search filenames, and open reviews with PDF or Word documents.

3 comparisons 3 Done
TitleFilesStatusChangesUpdatedActions
Showing 3 of 3 comparisons

New comparison

Original Spec PDF
⇩ Drop PDF here
Addendum PDF
⇩ Drop PDF here
These two files look reversed. Swap them to continue.

Queue

2/2 slots busy · at capacity, new uploads wait their turn
Processing
AMC Tender — Set 3 of 5
Comparing tables · 2m elapsed
Processing
AMC Tender — Set 4 of 5
Reading the addendum · under a minute
Queued
AMC Tender — Set 5 of 5
waiting · next up · queued 4m ago · ETA ~6m
Processing

Comparing spec against addendum…

This usually takes under a minute for a demo run.

← List
AMC Tender Spec vs Addendum No.1 ✓ Evidence complete
Spec Tender_Spec_Rev3.pdf · Add Addendum_No1.pdf · 3 add · 2 rem · 3 chg · 2 tbl
Export
ADD 27.1 Exact span Add p.3 · exact · New intumescent fire-stop requirement for riser penetrations

Summary of changes

Page 14 of 42
−90%+🔍
Original Spec
PARTICULAR SPECIFICATION
PS.BS02

27. Fire-Rated Cabling and Containment

27.1 The Contractor shall provide fire-rated cabling throughout all riser shafts, rated to 90 minutes in accordance with the base building specification.

27.2 All cable containment above false ceilings shall be galvanised steel trunking, minimum 100x50mm.

31. Testing and Commissioning

31.4 Testing and commissioning of the fire alarm system shall be witnessed by the Employer's Representative no less than 5 working days prior to handover.

Page 3 of 6
−90%+🔍
Addendum No.1
TENDER ADDENDUM No.1
PS.BS02-1

27. Fire-Rated Cabling and Containment

27.1 The Contractor shall provide fire-rated cabling throughout all riser shafts, rated to 120 minutes in accordance with the base building specification.

27.1A New: All penetrations through fire-rated risers shall be sealed with an intumescent fire-stop system, tested to BS 476 Part 20.

31. Testing and Commissioning

31.4 Testing and commissioning of the fire alarm system shall be witnessed by the Employer's Representative no less than 10 working days prior to handover.